Last night at the CB5 transportation committee, the Grand Street Bridge replacement was discussed. There will be a temporary structure built on the south side of the bridge to allow passage during demolition and reconstruction. They are looking to start in 2030 and complete it in 2034. A center-lift design was chosen, similar to this (but not as big): ... See MoreSee Less