CSX is currently adding a second track for its freight operations. The project is known as the “Fremont Secondary Track Extension”. Originally, there were two tracks, but for some reason back in the 1980s, one track was removed. This could mean more freight and garbage trains or less time when trains sit and idle. We shall find out. (The IBX will be built adjacent to and west of the CSX tracks.) Photo by Richard Polgar.